Henry J Restoration - Step 5N
Inspect the Car, Evaluate and Document the Work to be Done
5M
||
Back
||
5O
Its time for the inspection of the engine.
Section
Part
Condition
Cost Estimate
Removal Sequence
N.) Engine
8.000
Fuel
Air Cleaner
8.020
Fuel
Fuel Lines
8.040
Fuel
Fuel Pump
8.080
Engine
Engine
8.100
Fuel
Accelerator Linkage
8.100
Fuel
Gas Pedal
8.120
Fuel
Gas Pedal Boot
$25
8.140
Fuel
Overdrive Kick down Switch
Worked when parked
Must be cleaned up
8.160
Fuel
Carburetor
8.180
Driveshaft
Driveshaft
8.190
Driveshaft
Slip Yoke
8.191
Driveshaft
Universal Joint
8.192
Engine
Oil Filter
8.200
Exhaust
Exhaust Pipe
$100
8.230
Exhaust
Muffler
8.250
Exhaust
Header Pipe
$50
8.300
Exhaust
Exhaust Clamps
$20
8.320
Exhaust
Exhaust Brackets
8.340
Air Intake
Intake Manifold
8.420
Exhaust
Exhaust Manifold
8.440
Overdrive
Overdrive Relay
Cooling
Water Pump
8.520
Cooling
Fan
7.220
Cooling
Fan Belts
7.240
Battery
Generator
8.540
Battery
Voltage Regular
8.560
Ignition
Distributor
8.600
Ignition
Coil
8.620
Ignition
Spark Plugs
8.640
Ignition
Spark Plug Cables
$30
8.660
Horns
Horn Left
8.680
Horns
Horn Right
8.700
Horns
Horn Relay Switch
8.720
Horns
Horn Blowing Mechanism
8.740
Overdrive
Overdrive Relay
8.750
$225
Back