Henry J Script

Henry J Restoration - Step 5U
Inspect the Car, Evaluate and Document the Work to be Done

5T || Back || 5V

Its time for the inspection of the floor. 

 

 

Section  Part Condition Cost Estimate Removal Sequence
U.) Floor   88.000
Floor Front Floor Pan ooo   88.990
Floor Rear Floor Pan     88.990
        $0  

Back